Power is becoming the defining constraint on economic growth. Exigent exists to remove that constraint. The next decade belongs to those with access to power.

Our Standard

We build power that works.

Success requires discipline, preparation, and the ability to solve problems before they become obstacles. That principle guides every project we pursue and every decision we make.

We develop infrastructure that performs, financing that works, and partnerships that last.

Because if the plant does not run, nothing else matters.

Power that shows up. Projects that close. Infrastructure that lasts.

gas-turbine-inlet-air-hole-filter-system-large-ai-2026-01-08-06-35-29-utc.jpg

Develop the next generation of power infrastructure — together.

project experience

4,500+ MW in active development.

Projects spanning ERCOT, SPP, PJM, and British Columbia — across behind-the-meter, utility-scale, storage, and advanced technology markets.

ERCOT — Texas

Battery Storage (8 projects)

1,060 MW

Natural Gas Peaker

150 MW

BTM Data Center

800 MW

Hydrogen Combined Cycle

515 MW

Hydrogen Fuel Cell + CCS

90 MW

SPP — Southwest Power Pool

BTM Data Center

1,060 MW

Base Load Natural Gas

150 MW

Base Load Natural Gas

800 MW

PJM — Mid-Atlantic

BTM Data Center

C&I Microgrids (5 projects)

200 MW

Hybrid

Canada — British Columbia

Hydro Component

Natural Gas Component

50 MW

250 MW

Total Hybrid Plant

300 MW